Irin-iṣẹ ile-iṣẹ Mit-ivy Advanced Acrylic Latex Sealing Primer pẹlu agbara didasilẹ to dara julọ






Ohun elo
O ni ifunmọ ti o dara julọ si awọn sobusitireti irin ati awọn alakọbẹrẹ orisun omi, ati awọn ohun-ini ti ara ati ti iṣelọpọ ti o dara julọ lẹhin igbi awọ ti gbẹ.
5. fiimu kikun ni itọju ina to dara julọ ati itọju awọ lẹhin gbigbe.
Ohun elo ti a ṣe iṣeduro O dara fun aabo idominugere ti awọn oko nla, awọn ẹya ẹrọ, ẹrọ ina ile ina, ati bẹbẹ lọ nibiti a nilo aabo giga.
Imọ data Imọ Awọ oriṣiriṣi
Igbẹ gbigbẹ (50% aiṣedede) 15 ℃ C <1h ; 25'C <0.5h
Ri to gbẹ (50% ọriniinitutu) 15'C <48h; 25 ° C <24h
Kọlu "kg.cm" 50
Omi (50 ± 5μm) fiimu kikun 72h ko ni roro, kii ṣe iranlọwọ isubu, kii ṣe ipata.
Iwa lile 0.3 (pendulum meji) ohun elo idanimọ ohun-elo imọ-ẹrọ sisanra (23 ± 3jμm)
Lẹẹmọ (Hegelian) Ipele 1
Itọju oju Ilẹ ti ohun elo ti a bo yẹ ki o ni ominira ti ọrinrin, epo, erogba acid ati eeru.






Awọn alaye Awọn ọna
Irin pẹlu awọ afẹfẹ: Ibọn kekere tabi awọn ọna iredanu iyanrin bii processing si ipele Sa2.5, nibiti iredanu iyanrin ko le ṣe yẹ ki o jẹ didan ni sisẹ tabi
Kemikali mu lati yọ gbogbo awọn ejika fifọ lilefoofo kuro.
Irin laisi awọ afẹfẹ: sandblasted (shotblasted) si Sa2.5 tabi muu ṣiṣẹ afẹfẹ, awọn irinṣẹ lilọ itanna si St3.
Alurinmorin, gige-ina tabi atunse iṣẹ ina ti awọn agbegbe to jo: sisun si ipele St3.
Awọn ohun elo ipilẹ pẹlu fiimu kikun atijọ: yọ awọn patikulu awọ atijọ ti o lọ silẹ ati ipata, ati iyanrin si St3 pẹlu afẹfẹ tabi awọn irinṣẹ sanding ina.
A le lo package kikun ti aṣa pẹlu alakoko orisun omi H902, tabi lo nikan bi aṣọ ẹwu ti gbogbogbo, tabi lo pẹlu awọn oriṣi miiran ti awọn ọja alakoko (nilo lati baamu fun iṣeduro).
Construction data Table dry (50% temperature) 15'C<th;25℃C<05h Actual dry (50% humidity) 15℃C<24h;25℃<12h Density about 1.1-1.20g/cm' Theoretical coating rate 0.15-0.2kg/m' (dry film 40-50) μm)
It is recommended to apply 2 coatings, which can be applied in the way of warm touching temperature to ensure that the dry film is 40-50μm.
To be sanded and finished with sandpaper.
Construction method Air or robot spraying is possible. Mix the paint before use, adjust the viscosity according to the construction method.
Add 5-15% of water. Add water and stir evenly, then leave the surface to work without bubbles.


Construction environment 1. The brain playground should have good ventilation and dust removal facilities to ensure the quality of construction.
2. The construction should be carried out under the condition that the mixing degree is above 5℃C and the relative humidity of the environment should be <70%.
3. The substrate temperature shall be not less than 5' and shall be more than 3'C above the air dew point temperature.
washout
Vehicle Type | 100% Acrylic Latex | |
COMPOSITION (nominal) | Pigment : Lightfast Non-Lead Pigments & Mineral Extenders.
Blinder : Acrylic Emulsion. Solvent : Water. |
|
Volume Solids | 31.8% | |
Coverage per Gallon at Recommended Film Thickness | 400 –450 Sq. Ft. (37-42 m2) | |
Recommended Film Thickness
(Depending on surface texture and porosity. Be sure to estimate the right amount of paint for the job. This will ensure color uniformity and minimize the disposal of excess paint) |
Dry 1.2 mils
Wet 3.8 mils |
|
Dry Time @ 77° F (25° C) @ 50% RH
(High humidity and cool temperatures will result in longer dry, recoat and service times.) |
To Touch 1 Hour
To Recoat 2 to 4 Hours |
|
Dries By | Evaporation, Coalescence | |
Viscosity | 99 ± 2 KU | |
Gloss / Sheen | Flat (5-10 @ 85°) |
Shipping time by Sea (Just for reference) | ||||||||
North America |
11~30 days | North Africa | 20~40 days | Europe | 22~45 days | South-east Asia | 7~10 days | |
South America | 25~35 days | WestAfrica | 30~60 days | MiddleEast | 15~30 days | East Asia | 2~3 days | |
Middle America | 20~35 days | EestAfrica | 23~30 days | Ocenia | 15~20 days | South Asia | 10~25 days |



FAQ
1.About Sample
We provide free sample for testing.
2.OEM,ODM service available.
3.According to customer's request, packed with pallet or without pallet.
Tile adhesive(20kg/bag)packing with pallet specification:
64 bags/pallet = 1.28 MT/pallet
72 bags/pallet = 1.44 MT/pallet
One full 20ft container max loading 27.6MT.
With pallets can load 1360 bags, without pallet can load 1380 bags.







